Karşıyaka · Bostanlı
Çınar Apartments
A 1978 building with 10 flats became a new block with 14 flats and a shop.
Services
From the risk assessment to handing over the keys, side by side with the flat owners: one contact, a written schedule.

Urban renewal is a matter of trust before it is a matter of construction. Ermizan Yapı runs every step, from the risk assessment and demolition to the building permit and occupancy, together with the flat owners and on a written schedule. We send a photo progress report at the end of each month and bring minutes to every meeting.


Process
We listen to the building and its owners; the preliminary report is free.
The licensed firm’s report and the land-registry annotation.
Owner meetings, allocation table, contract signing.
Architectural, structural and MEP design, municipal approval.
Monthly photo reports, site diary, owner visit days.
Occupancy, title transfer and two years of on-site service.

Karşıyaka · Bostanlı
A 1978 building with 10 flats became a new block with 14 flats and a shop.

Bornova · Erzene
A new 10-flat block replacing an old 8-flat building within walking distance of the campus.

Buca · Şirinyer
Risk assessment complete; contract signed with 12 owners, permit process under way.
SSS
No. After a risky-building decision, the majority set out in law can decide. We recommend confirming the current threshold and the procedure for minority shares with your lawyer and municipality; we prepare the meetings and documents.
We put the vacating date in writing in the contract; the rent support application and any contractor rent contribution are stated clearly.
Existing land shares, new gross areas and floor/orientation preferences are shown in one table; a draw or agreement method is chosen together.