Urban renewal companion

Renewing your building, without getting lost

A preliminary assessment, a step-by-step timeline and a preparation list for the owners’ meeting. Free, and for information only.

Sıcak tonlu cephe ve derin balkonlar

Preliminary assessment

Your building, your road map

  1. 1 Building
  2. 2 Situation
  3. 3 Your road map

The process

Eight steps from risk to keys

  1. 1

    Risk assessment

    A licensed firm assesses the building; if found risky, the decision is annotated on the title.

  2. 2

    Owners’ decision

    Owners meet, compare offers and decide by the majority set out in law.

  3. 3

    Contract

    Allocation table, schedule, guarantees and rent support are put in writing.

  4. 4

    Design and permit

    Soil survey, architecture and structure, municipal approval.

  5. 5

    Vacating and demolition

    Utilities closed, asbestos survey, controlled demolition.

  6. 6

    Construction

    Site diary, monthly reports, visit days.

  7. 7

    Occupancy and title

    Occupancy permit, utilities, title transfer.

  8. 8

    Two years of service

    On-site support after handover.

Process photo story

What the street sees, step by step

Representative photos from different projects. We only show a before/after slider when we have licensed photos of the same building; we never use montages.

  1. Sözleşmenin elle imzalanması, siyah beyaz

    01 · First meeting

    We listen to the owners and learn the building’s story.

  2. Nivo ile ölçüm yapan saha mühendisi

    02 · Survey

    Measured survey, ground and risk report.

  3. Masada uygulama projesi üzerinde çalışma

    03 · Design

    Each owner’s preferences become drawings.

  4. Yıkım sahasında moloz ve iş makinesi, yelekli saha çalışanı

    04 · Demolition

    Controlled demolition after an asbestos survey.

  5. Radye temel için hazırlanan donatı ve kazı

    05 · Foundation

    Raft foundation; inspection before every pour.

  6. Gökyüzüne karşı betonarme kiriş ve kolonlar

    06 · Frame

    The frame rises floor by floor; monthly reports.

  7. Cephe iskelesi kurulmuş yeni bina

    07 · Facade

    Scaffolding, walls, windows and insulation.

  8. Ahşap kaplamalı balkonları olan yeni konut

    08 · Finished

    A new building in tune with its street.

  9. Yeni konutun anahtarı teslim ediliyor

    09 · Keys

    Handover with a checklist, then title deeds.

SSS

Questions owners ask

All questions
Is the preliminary assessment paid?

No. The first assessment, online or at our office, and the first owners’ meeting presentation are free.

Who carries out the risk assessment?

Firms licensed by the ministry. Owners choose the firm; we guide the application and paperwork.

How long does the process take?

It depends on the building and its owners. From agreement to occupancy most of our projects took 24 to 34 months; the exact schedule goes into the contract.